The Future of Wastewater Treatment Series: Salt Lake City, UT

This article is part of our feature on the future of wastewater in the U.S.’s fastest growing metro areas. We’re using the Transcend Design Generator to automatically build, expand, or upgrade regional wastewater treatment systems in each of these regions.

Utah, home to some of the fastest-growing regions in the United States, is a beacon of sustainable development. Two of its counties, Salt Lake County (#30) and Utah County (#35), have witnessed tremendous growth, necessitating advanced wastewater treatment solutions. It’s in this context that Transcend Design Generator (TDG) proposes an expansion of the Jordan Basin Water Reclamation Facility (JBWRF).

Commencing its construction in 2009, the JBWRF has been a testament to forward-thinking planning. The state-of-the-art facility uses membrane technology and ultraviolet light disinfection, allowing it to deliver water ready for use in secondary irrigation systems. With an initial capacity of 15 MGD, it was designed keeping future needs in mind.

With Salt Lake City population growth trajectory, TDG recognizes the need to build upon this foresight. Our plan is to extend the JBWRF capacity to 25 MGD, accommodating the increased water demand due to the population boom.

As we engage in this expansion, a peculiar local geography fascinates us – the Antelope Island. Nestled next to Salt Lake City and extending into the Great Salt Lake, this landmass stirs a compelling debate. You might wonder, as we did, why it’s called an ‘Island’ when it is, in fact, a peninsula. This naming anomaly, while perplexing, adds a unique charm to our Utah endeavor. If anyone has insights into this nomenclature mystery, we’re all ears!

As we venture into this expansion project, we remember that our job isn’t just about managing wastewater, but preserving the integrity of regions, their stories, and their peculiarities. With TDG, we’re not only engineering solutions for today but also safeguarding our tomorrow. As for the case of Antelope Island, we might not solve the naming riddle, but we’ll ensure to uphold its natural beauty through our sustainable approach.

If you’d like to see the full design package for this treatment plant, send us a note at info@transcendinfra.com or contact us here and a member of our team will share it with you!

If you enjoyed this piece you may also want to read about the future of wastewater in Houston.

Articles

Latest articles

Transcend believes each team member brings a unique viewpoint on what we do and how we do it. Read about Transcend through the eyes of some of our team members by clicking the links below.

Brazilian children playing in clean water
SABESP Signs with Transcend to Accelerate Water Infrastructure Design and Digital Engineering Transformation in Brazil

São Paulo, Brazil – July 15th, 2025 –SABESP, one of the largest water and wastewater...

July 15, 2025

Read
Brazil Map
Caesb and Transcend Collaborate to Bring Advanced Generative Design to Sanitation Infrastructure in Brazil

Transcend’s generative design platform will support Caesb’s modernization efforts and accelerate sustainable wastewater projects in...

July 2, 2025

Read
Unlock Enhanced Design Precision in Substation Projects with Our New “Spaces and Clearances Inputs” Feature

We continuously strive to empower engineers with software that refines and enhances the accuracy of...

June 27, 2025

Read
wastewater treatment works
De-Risking Infrastructure Planning With Better Design Data

Digital transformation in the infrastructure sector isn’t failing because of a lack of automation. It’s...

June 26, 2025

Read
Brazil
Brazil’s Mandate for Universal Water and Sanitation: Goals, Progress, and Challenges

National Sanitation Goals and Legal Mandates Brazil has embarked on an ambitious plan to ensure...

June 13, 2025

Read
Sensat and Transcend Forge Strategic Integration to Accelerate Smarter, More Constructible Infrastructure Design for the Water and Energy Sectors

London, UK – Sensat, the visualisation platform that brings real-world context to infrastructure projects, today...

May 16, 2025

Read
View More