The Problem
BRK Ambiental faced high costs and long timelines during wastewater project evaluations, which made adaptable master planning, new build, and upgrade strategies in an evolving regulatory landscape a major challenge. Manual design processes impeded their ability to effectively evaluate new technologies like energy-efficient blowers and advanced processes like MBBR and MABR.
leveraging TDG
BRK Ambiental partnered with Transcend to transform their wastewater project evaluation process. By using Transcend Design Generator’s (TDG) civil, mechanical, and process engineering outputs, BRK evaluated 8-10 more alternatives per facility to inform investment priorities. The partnership reduced design costs, improved facility operations, and ensured adaptability to changing conditions like population growth, stringent regulations, and rising energy costs.