The Future of Wastewater Treatment Series: Jacksonville, FL

This article is part of our feature on the future of wastewater in the U.S.’s fastest growing metro areas. We’re using the Transcend Design Generator to automatically build, expand, or upgrade regional wastewater treatment systems in each of these regions.

Addressing the rapidly increasing population of Jacksonville, which includes Duval (#37) and St. Johns (#57) counties, Transcend Design Generator (TDG) is at the forefront of crafting sustainable wastewater management solutions. With a combined population growth of approximately 220,000 residents from 2010 to 2020, the area demands an increased wastewater treatment capacity, roughly 15 MGD.

To meet this, TDG will design two main treatment plants, one handling 10 MGD and the other 5 MGD. Unlike the flatter southern parts of Florida, Jacksonville’s varied topography requires the division of capacities. Despite the two separate facilities, our design strategy will continue to prioritize minimal land impact to maintain the area’s natural beauty.

Our advanced design software will facilitate the creation of plants incorporating primary clarifiers for initial wastewater treatment. This step enhances efficiency by settling out suspended solids and reducing the load on subsequent stages.

Next, Sequential Batch Reactors (SBRs) will be incorporated for the main biological treatment phase. The SBR process offers operational flexibility and efficiency, making it an excellent choice for the varied loads expected in a growing population area.

Chemical disinfection will be the final treatment step, ensuring the safety of the treated water before discharge. All these stages are designed to provide a thorough treatment process within a compact footprint, minimizing environmental impact.

If you enjoyed this piece you may also want to read about the future of wastewater in Kern County.

Articles

Latest articles

Transcend believes each team member brings a unique viewpoint on what we do and how we do it. Read about Transcend through the eyes of some of our team members by clicking the links below.

Brazilian children playing in clean water
SABESP Signs with Transcend to Accelerate Water Infrastructure Design and Digital Engineering Transformation in Brazil

São Paulo, Brazil – July 15th, 2025 –SABESP, one of the largest water and wastewater...

July 15, 2025

Read
Brazil Map
Caesb and Transcend Collaborate to Bring Advanced Generative Design to Sanitation Infrastructure in Brazil

Transcend’s generative design platform will support Caesb’s modernization efforts and accelerate sustainable wastewater projects in...

July 2, 2025

Read
Unlock Enhanced Design Precision in Substation Projects with Our New “Spaces and Clearances Inputs” Feature

We continuously strive to empower engineers with software that refines and enhances the accuracy of...

June 27, 2025

Read
wastewater treatment works
De-Risking Infrastructure Planning With Better Design Data

Digital transformation in the infrastructure sector isn’t failing because of a lack of automation. It’s...

June 26, 2025

Read
Brazil
Brazil’s Mandate for Universal Water and Sanitation: Goals, Progress, and Challenges

National Sanitation Goals and Legal Mandates Brazil has embarked on an ambitious plan to ensure...

June 13, 2025

Read
Sensat and Transcend Forge Strategic Integration to Accelerate Smarter, More Constructible Infrastructure Design for the Water and Energy Sectors

London, UK – Sensat, the visualisation platform that brings real-world context to infrastructure projects, today...

May 16, 2025

Read
View More