What’s new in TDG: more flexible chemical dosing options, preferred build zones, and more

Written by: Anna Batki, Product Marketer

We’re constantly rolling out updates and new features for the Transcend Design Generator (TDG). See what we’ve been up to in January!

TDG now allows planning for low flow facilities

Any user of TDG can automatically generate designs for small format wastewater treatment facilities of flows as low as 100 m3 per day (22,000 gal per day). TDG has been used for almost a decade to generate 12,000+ wastewater facility designs, but until now has not been used to generate treatment facility designs for small plants below 400 m3/d . These plants are common in suburban and rural areas. 

‘Preferred build zones’ gives users more control over site arrangements

Previously, you could use our site marking tool to draw no build zones to avoid new assets in those areas. Now, you can use our marking tool to specify preferred build zones, the areas where you would like to place new pretreatment, biology, disinfection, and sludge assets. This gives the user more control over the final site arrangement.

More flexible chemical dosing options available in TDG

TDG now allows users more flexibility in evaluating chemical dosing options, leading to more efficient designs for chemical phosphorus removal, and proper comparisons with Bio-P. Now, as a user, you have the ability to choose if you would like to dose before the primary clarifiers or not, and to control details about the dosing such as chemical type, concentration, density, TSS removal efficiency, and Dissolved orthophosphate setpoint. The impacts on water chemistry are then carried through the downstream process units. Designs generated from this point forward have these considerations integrated into the full engineering package, and you may also re-run your previous designs to leverage this new functionality.

Chemically Enhanced Primary Treatment (CEPT) has also been included in this update. CEPT will enable users to select a primary clarifier equipped with chemical dosing.

New sign in page

It’s beautiful and it’s still the TDG, not a phishing page. Go on and sign in to run a new design.

Stay tuned for more updates coming your way!

Articles

Latest articles

Transcend believes each team member brings a unique viewpoint on what we do and how we do it. Read about Transcend through the eyes of some of our team members by clicking the links below.

Brazilian children playing in clean water
SABESP Signs with Transcend to Accelerate Water Infrastructure Design and Digital Engineering Transformation in Brazil

São Paulo, Brazil – July 15th, 2025 –SABESP, one of the largest water and wastewater...

July 15, 2025

Read
Brazil Map
Caesb and Transcend Collaborate to Bring Advanced Generative Design to Sanitation Infrastructure in Brazil

Transcend’s generative design platform will support Caesb’s modernization efforts and accelerate sustainable wastewater projects in...

July 2, 2025

Read
Unlock Enhanced Design Precision in Substation Projects with Our New “Spaces and Clearances Inputs” Feature

We continuously strive to empower engineers with software that refines and enhances the accuracy of...

June 27, 2025

Read
wastewater treatment works
De-Risking Infrastructure Planning With Better Design Data

Digital transformation in the infrastructure sector isn’t failing because of a lack of automation. It’s...

June 26, 2025

Read
Brazil
Brazil’s Mandate for Universal Water and Sanitation: Goals, Progress, and Challenges

National Sanitation Goals and Legal Mandates Brazil has embarked on an ambitious plan to ensure...

June 13, 2025

Read
Sensat and Transcend Forge Strategic Integration to Accelerate Smarter, More Constructible Infrastructure Design for the Water and Energy Sectors

London, UK – Sensat, the visualisation platform that brings real-world context to infrastructure projects, today...

May 16, 2025

Read
View More